Four steps are required to check brickwork as it is being built:
- Gauge – check the height of the course
- Level – make sure the course is level
- Plumb – make sure that the wall is vertical
- Straight – make sure the wall is straight
Gauge
When building any wall, it’s necessary to keep the courses at the corners at the same height. A gauge board is used to to this. Mark out a piece of timber with marks corresponding tospacing of one brick height plus the thickness of the bedjoint (normally a total of 75cm).
Use the rod at the corner when each course is begun and check that it is at the correct height, On uneven ground, start by putting a datum peg next to the wall so that the gauge rod can be easily positioned.
Level
Use a spirit level to keep the courses level. Remember thatthe corner bricks have been set to the correct height, soany adjustment should be by bedding down the bricks in from the corner.
Bricks are not made to very tight tolerances, so don’t waste your time trying to get each brick exactly level, the point is to get the parts of the bricks which touch the underside of the spirit level, level. Don’t worry about trying to get the bricks level widthways.
Plumb
Check that the wall face is vertical by using a spirit level, tap the brick across the wall as necessary to adjust thebrick as necessary. Do not try to do this to both sides ofthe wall, choose one side as ‘the face’ and just plumb that side.
Do it along the wall, spacing the points approximately just under the length of the spirit level.
Check both sides of corners.
Straight
Straighten the course by using a straight edge between thepoints previous plumbed. Tap the bricks as necessary.
Like plumbing the wall, only check the face of the wall, don’t try to straighten both sides.
Again the problem of the shape of the bricks come intoplay. It’s unlikely that the straight edge will touch each brick across its whole face, try to get the centre of each brick totouch the straight edge and the two ends of the brick roughly equally spaced from it.